Everyone was early for their appointment and the sales rep was not overbearing. The installer was great; worked efficiently, and cleaned up afterwards.
Village of Harveysburg
The Village of Harveysburg project was completed in June of 2014. We removed 18 existing single-pane steel casement windows in 6 masonry openings and installed new glass block. We used the same aluminum channel and mull system with pre-assembled silicone glazed windows. The job was completed in 3 days.